Donnerstag, 17. Dezember 2015


On the 17th of December, 2015, Sulley, Stephen and I went to the site to change the motor control box because we realised it was not working fully authomatic. We realised that if the light goes off and later comes on, some one must open the power box to press the start bottom for the whole system to start, of which we don't want them to be opening the power bottom. We went to replace the electronic pump control box with a manual control box so that when the light is off and later comes on, since the on bottom is on and it is a manual one, the motor get its power and start operating without any body opening the power box. but when we got there, the manual control box was not able to switch on the motor, so it was getting late and we had to leave the old one there as it was.


On Wednesday, the 16th of December, 2015, we completed the project and handed it over to the community where the chief was not able to attend but some of the sub chiefs and some of the elders of the community were also there. PP was very happy and the community was also happy about the project. here are some of the pictures we took:

WHERE ARE THE PICs ????????????

And the TITEL is missing too all over !!!

Dienstag, 15. Dezember 2015



Today 15th of December, 2015, Sulley and I visited the site to complete the work there by fixing the float switch and the pump control. Later PP came there to check if every thing was okay. We went there at 11:00am and left there very late at 7:30 pm because we wanted to complete there work for the next day's handing over. here are some of the pictures I took on that day:






Montag, 14. Dezember 2015



Today the 14th of December, 2015, I went to the site to make sure that the floor concrete is casted, but when I went there, the masons were not available. I called them and they said they will cast it in the evening, so they were able to do it. Also, I went to buy the poly tank(5000 LT) and we were able to take it to the top. I also went to pay the painter who painted the metal gate, the bore hole cover and the power box. I was also able to go for the results of the water test. Here  are some of the pictures I took today:






Samstag, 12. Dezember 2015



Today on the 12th of December, 2015, the infra tec engineers visited the two sites in Nkwantakese to ix the pump. We were able to do that successfully the same day. here is a video.

Freitag, 11. Dezember 2015



because capedrill delayed the fixing of the pump, we were not able to visit the site until today that we went there because they are coming tomorrow. today on the 11th of December, 2015, Sulley and I went to the site to dig the ground 0.5m to fix the power box and also went to secure generator down to test the pump when it is fixed and tools like the spanners to the away the hand pump before fixing the EL pump. We left campus around 9:30am and left the site around 3:15pm. Here are some pictures I took when I was digging and mixing the concrete.









Freitag, 4. Dezember 2015



On the 3rd of December, 2015, all the Infra-tec engineers(PP, Stephen, Panford, Sulley and I) visited the two Nkwanta kese project.(gh it150928 and gh it150929). We first went to gh it150929 to see what is going on there and from there we went to gh it150928 to see how work was going. When we got to my site, we saw that every thing was ohky but just one pipe in the fetching station needs to be positioned well. When we were about to leave, I gave the welder some part of his work charge then from there we(Infra-tec engineers) went to blue eyes to have lunch.


I visited the site with Sulley on the 2nd of December, 2015. When we got there, we tried to pass a flexible rod through the pipes we laid for the wiring and we encountered a problem which we solved the problem. The problem was that, the flexible rod was not able to go through the pipes smoothly so we had to change the corners angle pipes we used. The plumber came to continue with his work but the masons did not come. I gave the plumber part of his work charge so he can complete the work. We took some of the water for the water test from my site and later went to Sulley's site to take some of the water from his site for the water test. We went there at 9:00am and left there at 3:00pm.

Dienstag, 1. Dezember 2015



i visited the site yesterday 30th November, 2015. The mason and the plumber were doing their work. The plumber was laying the pipes and the masons were plastering and dressing the wall and the pillars. The cement we bought got finished so we had to buy some more cement before the work can be completed. i gave some money for the filling of sand to be done for levelness before the concrete can be casted on the ground. I went there at 10:30 am and left there at 3:00 pm. Here are some pictures i took:







Freitag, 27. November 2015



Today on the 27th of November, 2015, i visited the site to make sure the mason continues the work. When i went there, they had finished laying the blocks for the fetching station and will start to fill the place before casting the flow concrete. i gave them their money for work charge. i gave the welder money to buy 2inch round galvanize pipe to fix the metal power box. I left to the site at 11:30am and left there at 3:40pm. Here are some pictures i took today:






Donnerstag, 26. November 2015


Yesterday, 25th of November, 2015, I went to the site with Sulley, to lay pipes for the wires before the down flow concrete can be casted. the masons are going to cast concrete around the iron rods on the flow before they can cast the 1m around the pillars. I was able to give the plumber the money to buy the materials for the plumbing works. I gave the carpenter and the steel bender the rest of their work charge and gave some money for water. I did digging for the laying of pipes. from 8:00am to 4:00pm. Here are some pictures I took:








Dienstag, 24. November 2015



i visited the site today, 24th of November, 2015, and made sure the steel bender and the mason worked on the down flow of the tower. also made sure the welder worked on the ladder for the tower and also gave some money to buy materials for bore hole cover. i went there at 11:00am and returned at 3:00pm. Here are some of the pictures i took:






Montag, 23. November 2015



On Friday the 20th of November, 2015, I visited the site and made sure the top concrete flow was casted and also made sure the welder worked the power box. Here are some of the pictures I took on that day:









 
 
 
 
Please this is the link to the account.
 
 
 
 
 

Donnerstag, 19. November 2015



Yesterday, 18th of November, 2015 from 7:30 am to 1:30 pm, Mr. Sulley and I went to the Nkwantakese site to lay the pipes for the wiring before the concrete can be casted. When we got there, the steel bender had not finished with his work, so the mason was waiting for him so he can start with the casting. So we were not able to lay the pipes. I was not able to update my blog yesterday because my laptop screen got spoilt and I went to replace it and when I got home, there was light out. I am going to complete the account today so I can send you the link. I was able to pay the carpenter, the steel bender and the mason part of their work charge.

Montag, 16. November 2015



Today on the 16th of November, 2015, i went to Nkwantakese water station. The carpenter was able to do the frame work with the wood to enable the steel bender to bend the iron rod to be fitted into the frame work done by the carpenter. The mason was waiting for the steel bender to finish with his work so they can cast the concrete. the stones and the sand were ready for construction. I gave money to the welder to buy the metal pipes for the metal gate, the power box and ladder to the tank. Today, when I got there, the carpenter and the steel bender were demanding some of their work charge money but I told them i cant give them money today but an sure to get them some of the money before Thursday.   I went there at 11:00 am and left there at 4:30 pm.

Here are some of the pictures I took today.

Here are the blocks for the construction of the fetching station


In this picture is the steel bender bending the iron rods to be put in the wood frame work before casting of the concrete.



 Beside the steel bender is the sand the mason is going to use for the concrete casting.


 This is the river side stones that the mason is going to use for the concrete.




These are the iron rod going to be used by the steel bender



These are the cements  going to be used by the mason