LINKs: ToDo-LIST ....... BLOG-OVERVIEW

Freitag, 4. Dezember 2015



I visited the site with Sulley on the 2nd of December, 2015. When we got there, we tried to pass a flexible rod through the pipes we laid for the wiring and we encountered a problem which we solved the problem. The problem was that, the flexible rod was not able to go through the pipes smoothly so we had to change the corners angle pipes we used. The plumber came to continue with his work but the masons did not come. I gave the plumber part of his work charge so he can complete the work. We took some of the water for the water test from my site and later went to Sulley's site to take some of the water from his site for the water test. We went there at 9:00am and left there at 3:00pm.