Today on the 16th of November, 2015, i went to Nkwantakese water station. The carpenter was able to do the frame work with the wood to enable the steel bender to bend the iron rod to be fitted into the frame work done by the carpenter. The mason was waiting for the steel bender to finish with his work so they can cast the concrete. the stones and the sand were ready for construction. I gave money to the welder to buy the metal pipes for the metal gate, the power box and ladder to the tank. Today, when I got there, the carpenter and the steel bender were demanding some of their work charge money but I told them i cant give them money today but an sure to get them some of the money before Thursday.   I went there at 11:00 am and left there at 4:30 pm.

Here are some of the pictures I took today.

Here are the blocks for the construction of the fetching station


In this picture is the steel bender bending the iron rods to be put in the wood frame work before casting of the concrete.



 Beside the steel bender is the sand the mason is going to use for the concrete casting.


 This is the river side stones that the mason is going to use for the concrete.




These are the iron rod going to be used by the steel bender



These are the cements  going to be used by the mason