Today 15th of December, 2015, Sulley and I visited the site to complete the work there by fixing the float switch and the pump control. Later PP came there to check if every thing was okay. We went there at 11:00am and left there very late at 7:30 pm because we wanted to complete there work for the next day's handing over. here are some of the pictures I took on that day: