Montag, 21. Januar 2019

Beginning 2019 Pump problem

[17:31, 21.1.2019] GH Gse-p1c Sulley Mustapha: I fix the new pump
[17:32, 21.1.2019] GH Gse-p1c Sulley Mustapha: Is running and all is ok
[17:33, 21.1.2019] GH Gse-p1c Sulley Mustapha: Sorry for the late reporting I was very busy these past weeks


nice woud be

 .... What happen ... estimate nr with price and date ... what work was done by date
.. all works by date

Samstag, 30. April 2016

On Friday, 29th of April, 2016, Emmanuel, Sulley and I went to my site Project Gh It 150928 to fix my plaque(memory plate). We were successful in our doing. Here are some of the pictures we took there.




















 

Mittwoch, 27. April 2016

On the 21st of April, 2016, I went to the office at Kronom to do all the photo copies into all the files(folders). I went there with Emmanuel and it is complete. The printer was prompting me that the black toner is finishing so it must be replaced.

Dienstag, 19. April 2016

Donnerstag, 17. Dezember 2015


On the 17th of December, 2015, Sulley, Stephen and I went to the site to change the motor control box because we realised it was not working fully authomatic. We realised that if the light goes off and later comes on, some one must open the power box to press the start bottom for the whole system to start, of which we don't want them to be opening the power bottom. We went to replace the electronic pump control box with a manual control box so that when the light is off and later comes on, since the on bottom is on and it is a manual one, the motor get its power and start operating without any body opening the power box. but when we got there, the manual control box was not able to switch on the motor, so it was getting late and we had to leave the old one there as it was.